Computer sweater knitting machine preparation process
Sweater production preparation process This process includes the preparation
of raw materials (preparation, inspection, processing) and the preparation of
production technology (prototyping of samples before production).
Raw materials (such as wool, washing materials, auxiliary materials, etc.) should be prepared in consideration of selection of varieties and specifications, as well as the amount and loss of materials (such as natural shrinkage, shrinkage, weaving reeds, broken materials, residues, normal loss of special wool and Other estimated losses); the inspection of raw materials includes quantity review, rickets inspection, color verification, expansion and contraction rate tests, and color fastness testing; after the testing is completed, it should be implemented according to industry standards. Preparation of production technology includes sweater knitting machine purchase, trial production, trial production, and measurement and collection of technical data.
1.1 Wool silo management Wool silo management plays an important role in the integrity of the production process.
a. The hair warehouse is kept clean and tidy, and the entry records are strictly kept in the storage book. All records must be instructed by the superior management department and signed by the consignee.
b. Inventory the number of pieces or boxes according to the wool list. If the number of pieces is not heavy enough, check whether the number of bundles is sufficient, such as the weight or the number of bundles are not consistent, and report in time.
c. Clean the shaving machine and the shaving workshop before shaving, and clean it several times a day.
d. In order to avoid the problem of flying hair, dark and light-colored wool can not be fleeced at the same time or in an isolated position.
e. Each cylinder must be filled with cylinder number paper. After weighing one cylinder of wool, it must be weighed and checked clearly. Do not mix wool materials with other cylinder numbers.
f. Use the correct barking method (knots should be small, usually cross-knotted). After knotting, the tail should not be too long, and it should not exceed 1/4 inch. g. If flower hair or hard hair is found, stop hitting the tank hair immediately. Wool material that has been opened must be wrapped up, and it should not be misplaced, and the office should be notified in time. h. Wool storage, to distinguish between customers, wool, ingredients and counts.
1.2 Management of the receiving and dispatching department. The receiving and dispatching department includes the sending and receiving of our loom and the sending and receiving of large-scale goods from outside factories.
a. There should be enough place in the receiving and dispatching department to store wool in an orderly manner.
b. Complete the preparation of sending and receiving materials, send out the weaving notice, production order and wool bill, and prepare the receiving and sending book according to the cylinder number, code number and number of the weaving notice.
c. Before weaving each cylinder of hair, leave 10% of the wool according to the average size to be unwoven, in order to avoid breaking or undressing in order to avoid insufficient wool.
d. According to the weight of the hair weaving order, take the wool to the hair warehouse and check the weight.
e. Every card player needs to write all the information and nail it with the code mark.
f. Check whether the whole material is complete before each shipment.
Raw materials (such as wool, washing materials, auxiliary materials, etc.) should be prepared in consideration of selection of varieties and specifications, as well as the amount and loss of materials (such as natural shrinkage, shrinkage, weaving reeds, broken materials, residues, normal loss of special wool and Other estimated losses); the inspection of raw materials includes quantity review, rickets inspection, color verification, expansion and contraction rate tests, and color fastness testing; after the testing is completed, it should be implemented according to industry standards. Preparation of production technology includes sweater knitting machine purchase, trial production, trial production, and measurement and collection of technical data.
1.1 Wool silo management Wool silo management plays an important role in the integrity of the production process.
a. The hair warehouse is kept clean and tidy, and the entry records are strictly kept in the storage book. All records must be instructed by the superior management department and signed by the consignee.
b. Inventory the number of pieces or boxes according to the wool list. If the number of pieces is not heavy enough, check whether the number of bundles is sufficient, such as the weight or the number of bundles are not consistent, and report in time.
c. Clean the shaving machine and the shaving workshop before shaving, and clean it several times a day.
d. In order to avoid the problem of flying hair, dark and light-colored wool can not be fleeced at the same time or in an isolated position.
e. Each cylinder must be filled with cylinder number paper. After weighing one cylinder of wool, it must be weighed and checked clearly. Do not mix wool materials with other cylinder numbers.
f. Use the correct barking method (knots should be small, usually cross-knotted). After knotting, the tail should not be too long, and it should not exceed 1/4 inch. g. If flower hair or hard hair is found, stop hitting the tank hair immediately. Wool material that has been opened must be wrapped up, and it should not be misplaced, and the office should be notified in time. h. Wool storage, to distinguish between customers, wool, ingredients and counts.
1.2 Management of the receiving and dispatching department. The receiving and dispatching department includes the sending and receiving of our loom and the sending and receiving of large-scale goods from outside factories.
a. There should be enough place in the receiving and dispatching department to store wool in an orderly manner.
b. Complete the preparation of sending and receiving materials, send out the weaving notice, production order and wool bill, and prepare the receiving and sending book according to the cylinder number, code number and number of the weaving notice.
c. Before weaving each cylinder of hair, leave 10% of the wool according to the average size to be unwoven, in order to avoid breaking or undressing in order to avoid insufficient wool.
d. According to the weight of the hair weaving order, take the wool to the hair warehouse and check the weight.
e. Every card player needs to write all the information and nail it with the code mark.
f. Check whether the whole material is complete before each shipment.
Comments
Post a Comment